SAM.gov · ED · Contract

Accelerator-Driven Sub-Critical Molten-Salt Assembly (ADS+MSA Facility)

Energy, Department Of

Status
Open
Maximum funding
Varies
Deadline
Dec 22, 2026
Instrument
Contract

About this funding opportunity

The.gov means it’s official.

Federal government websites often end in.gov or.mil. Before sharing sensitive information, make sure you’re on a federal government site.

The site is secure.

The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

You have 2 new alerts

Show / Hide Alerts

ISR Workspace: Increased Contract Volume

Show Details Jun 26, 2026 Following the implementation of revisions to the ISR eligibility logic within the Subcontracting Plan Reporting system on June 9, 2026, contractors might observe an increased volume of contracts and subcontracts in their Eligible Workspace. The inclusion of these records does not automatically necessitate an ISR submission. Contractors must evaluate the specific subcontracting plans associated with each contract and subcontract to determine their reporting obligations.

Subcontracting Plan Reporting system issues resolved

Show Details Jun 10, 2026 GSA deployed updates to SAM.gov to resolve known issues with the Subcontracting Plan Reporting system. Contractor users should review their Workspaces to ensure they can successfully create and submit their Individual Subcontracting Reports (ISR). Mid-year ISRs are due July 14, 2026. Visit sam.gov/esrs for more information.

See All Alerts

See All Alerts

Return to Workspace Contract Opportunity

Open Default Actions Menu

Version Current Record Pre-Award Solicitation Details Classification Description Contact Information Attachments/Links Accelerator-Driven Sub-Critical Molten-Salt Assembly (ADS+MSA Facility)

Active

Opportunity Accelerator-Driven Sub-Critical Molten-Salt Assembly (ADS+MSA Facility)

Active

Notice ID S-195186

Related Notice (blank)

Contract Opportunity Type Special Notice

Contract Line Item Number (blank)

Inactive Dates Jun 30, 2027

Inactive Policy Manual

Response Date Dec 22, 2026 5:00 PM MST

Published Date Jun 23, 2026 11:41 AM MDT

Department/Ind. Agency ENERGY, DEPARTMENT OF

Sub-tier ENERGY, DEPARTMENT OF

Office TRIAD - DOE CONTRACTOR

Original Set Aside No Set aside used

Product Service Code AJ15 - GENERAL SCIENCE & TECHNOLOGY R&D SVCS; GENERAL SCIENCE & TECHNOLOGY; R&D FACILITIES & MAJ EQUIP

NAICS Code 541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

Place of Performance (blank)

Initiative None

An accelerator-driven, sub-critical molten-salt nuclear system that centrally produces large quantities of tritium for fusion energy. By pairing accelerator-driven subcritical operation with molten-salt chemistry, the system offers a controllable, safety-forward pathway to produce fusion fuel, recover useful energy and convert legacy nuclear liabilities into strategic energy assets.

Overview:

The Accelerator-Driven Sub-Critical Molten-Salt Assembly (ADS+MSA) is a centralized nuclear facility that uses a high-power particle accelerator coupled to a liquid molten-salt system to reliably produce kilogram-scale quantities of tritium. Because the system is sub-critical, nuclear reactions only occur when driven by the accelerator, providing inherent safety and operational control. By combining proven accelerator technology with modern molten-salt chemistry, the ADS+MSA removes a major bottleneck to commercial fusion energy, recovers useful energy, and strengthens U.S. energy security and national security missions under existing Department of Energy safety frameworks rather than commercial reactor licensing.

Key Advantages: Enables large-scale commercial fusion energy by providing a reliable, centralized source of tritium, eliminating the need for fusion plants to breed their own fuel and significantly reducing cost, complexity, and deployment risk. Operates in an inherently safe, sub-critical configuration in which nuclear reactions stop when the accelerator is turned off, avoiding runaway scenarios and allowing operation under DOE…

Topic areas: General and Cross-cutting R&D, Energy and Environment.

Funding amount

This contract provides Varies in funding.

Deadline

Applications are due Dec 22, 2026. Confirm the exact closing time on the official program page before applying.

Who can apply

This opportunity is open to the following applicant types:

  • SME
  • MidCaps
  • Large Company
  • Startups
  • University
  • Research Organization
  • NGOs
  • Public Authorities

Eligibility

No Set aside used

Agency

Accelerator-Driven Sub-Critical Molten-Salt Assembly (ADS+MSA Facility) is administered by Energy, Department Of (ED), listed via SAM.gov.

Open the official opportunity page Browse all US R&D funding on GrantField

Programme data is aggregated by GrantField from public sources and may change. Always verify details on the official page before applying.